932 041 041

en

News 

News

FGC invests 2.2 millions on maintenance work at the engine room of the Sant Joan Funicular

Share this event
Tags: funicular de sant joan, maintenance work, service

Sant Joan Funicular out of duty due to maintenance work on the machine room until March 16th 2018

FGC renews the engine room of the Funicular de Sant Joan. As of November 2, and until March 16, 2018, the funicular will be out of service while the renovation works are being carried out.
Specifically, FGC changes the entire main drive of the infrastructure, installing a new system consisting of a pulley, a counter-politician, a reducer, a brake system and a three-phase motor. The new installation also includes the renovation of all the electrical equipment associated with the system, as well as that of the funicular control room. The pulleys of the track are also replaced. These actions, with an investment of 2.2 million euros, allow improving the funicular quality standards and minimizing the number of stops or breakdowns in the usual service.

More info: Press release

FGC invests 2.2 millions on maintenance work at the engine room of the Sant Joan Funicular
Other Group FGC websites
© Grup FGC 2015 / Customer service: 932 041 041 /
Top
x
My bookings
Enter your booking number and your email to check your reservation, cancel it or change it.